亚洲欧洲高清无码在线_日本欧美黄色网站免费_中文字幕无码手机在线看_国产免费网站看v片在线无遮挡

Lucheng seawall project of Longyuan Group won the highest award in the hydraulic engineering industry!

Time : 2021-12-28

On December two7, China Water Conservancy Engineering Association announced the winners of China water conservancy engineering quality (Dayu) award from two thousand and nineteen to two thousand and twenty,Seawall project of Wenzhou Lucheng Oujiang Ring Expressway to woqishan section invested and constructed by Longyuan GroupPPP project (hereinafter referred to as "seawall project") is prominently listed. Seawall project is the first project in Lucheng District to win this award, and it is also one of the first projects in Wenzhou to win this award.


China water conservancy engineering quality (Dayu) Award (abbreviation)"Dayu project award") is the highest award for high-quality projects in the water conservancy industry. It is an excellent project award focusing on project quality and taking into account factors such as project construction management, project benefits and social impact. The Dayu project award is divided into five categories: reservoir pivotal project, South-to-North Water Transfer Project, river regulation and embankment project. Only 45 water conservancy projects in China are shortlisted. Only 8 items in the list of river training and embankment works where the seawall project is located are shortlisted.

It is reported that the seawall project is one of the first ten key projects in Zhejiang Province One of the PPP projects, listed in the PPP project library of the national development and Reform Commission. The project is located on the West Bank of Oujiang River in Wenzhou City. It starts from the belt Expressway in Lucheng District in the north and ends at Woqi mountain in the south. The total length of the project is 5.946 km. The dampproof standard of the new dike and pond is one00 year return period, II and other dike projects. The total investment of the project is RMB one883.7 million, which has been completed and accepted in December two thousand and nineteen.


The flood control (tide) standard of the original embankment within the scope of seawall project isOnce in 50 years, it was built in the one980s. After years of operation, this section of flood embankment has been identified as "class III pond". At the same time, this section is a tanning area along the river, where old factories gather and there is a large flow of people, resulting in garbage everywhere on the upstream surface of the dike and pond and within the management range, seriously affecting the flood discharge capacity of the river and damaging the ecological environment of the surrounding area. The project fully integrates the construction of flood control and water conservancy projects and municipal construction, and makes room for the layout of municipal engineering facilities such as roads along the river and riverside landscape through the outward movement of embankment line, which not only effectively improves the flood control standard of the west section of Lucheng riverside, but also completely changes the dirty and disorderly phenomenon along the river to the west of Woqi mountain, characterized by "embankment scenery Road", Organically combine the flood control lifeline with the riverside scenery.


Before Dayu project award, the project has received a number of honors. Awarded after the completion of the projecttwo thousand and nineteenAnnual Wenzhou Construction ProjectOujiang cupHigh quality engineering awardtwo thousand and twentyAnnual construction project in Zhejiang ProvinceQianjiang cupQuality Engineering Award; Landscape greening project in Zhejiang ProvinceExcellent landscape engineeringWon in the award selectiononeJintwoSilveroneCopper; In the previous construction process, it has been rated as the provincial construction safety and civilization standardization site and the municipal water conservancy and Hydropower Safety and civilization standardization site.